1
Flood Risk & Deep Excavation
Integrating a 36 m³ indoor swimming pool demanded significant excavation within the existing footprint, introducing flood risk and structural complexity. Our solution: a completely independent storm-water drainage system and bespoke soakaway network, ensuring long-term flood resilience and protection of the leisure suite.
2
Material Volatility
Global material shortages during the 2021 build phase threatened programme certainty and specification standards. Our solution: leveraging our specialist supplier network to adapt the design in real time, sourcing alternative high-specification components, including SFS framing and Siberian Larch, without compromising quality or budget.
3
Planning & Heritage Constraints
Strict planning conditions required full retention of the original ridge heights and footprint within a historic setting. Our solution: utilising a Z-Purlin roofing system and intelligent floor-level management to maximise internal volume while remaining entirely within the building’s original silhouette.